top of page
Casa Grande 3.jpeg

Banner Health- Casa Grande Medical Center

An 11,000sf new state-of-the-art Central Sterile Processing Department (CSPD) and Endoscopy Procedure Department. A comprehensive renovation upgrade to enhance efficiency, safety, and compliance with modern healthcare standards. The redesign of the CSPD included several upgrades to the sterilization equipment, improved airflow systems and critical water infrastructure as well as separations of decontamination room, preparation stations and sterile storage. The inclusion of the endoscopy department was designed to optimize patient care, staff efficiency and infection control measures. This includes 6 patient pre/post operation bays and 3 procedure rooms equipped with enhanced patient privacy and advanced imaging and scope processing technology.

​

​

​

Owner: Banner Health 

Architect: Archsol

Square Feet: 11,294

Location: Casa Grande

© 2025 Integrity Building Corp - An Employee Owned Company

bottom of page